Turkey Creek has long-been prone to flooding, and not just the lower portion along Southwest Boulevard. Upper Turkey Creek also floods and is a threat to the community that has been investigated and the solution needs to be designed. The current request is shown below:
UPPER TURKEY CREEK, Merriam, Kansas
FY16 $500,000 Begin Design
STATUS
• FY16 $500,000 begin design.
• Severe flash flooding threatens life and property.
BENEFIT OF PROJECT
Structural and non-structural flood damage reduction solutions and ecosystem restoration.